BENCHMARKING CHECKLIST
CHECKLIST PHASE 1 OF 4

Prepare

SELECT PHASE
0 of 6 completed 0%
Confirm the benchmark set
Today
Throughput / revenue flow is included
Today
Reference confirmed per metric
Today
Data sources identified
Today
Review meeting scheduled
Today
Previous action plan status is known
Today
CHECKLIST PHASE 2 OF 4

Collect Data

SELECT PHASE
0 of 6 completed 0%
Data period clearly defined
Week
Internal actuals pulled from single authoritative source
Week
Data completeness verified
Week
External reference data is current
Week
Comparable peer group confirmed
Week
Prior period data included
Week
CHECKLIST PHASE 3 OF 4

Analyse

SELECT PHASE
0 of 6 completed 0%
Gap calculated for each metric
Week
Gaps ranked by business impact
Week
Root cause identified for top 3 gaps
Week
Positive variances noted
Week
External factors separated from internal causes
Week
Output ready before review meeting
Week
CHECKLIST PHASE 4 OF 4

Review & Act

SELECT PHASE
0 of 6 completed 0%
Previous action plan reviewed first
Monthly
Max 3 new actions agreed per cycle
Monthly
Every action has a named owner
Monthly
Every action has a deadline and a success metric
Monthly
Actions logged in tracking system
Monthly
Next review date confirmed
Monthly
COST REDUCTION CHECKLIST
CHECKLIST PHASE 1 OF 5

Cost Mapping

SELECT PHASE
0 of 6 completed 0%
Full P&L pulled and categorised by cost type
Today
Each cost line labelled: fixed / variable / semi-variable
Today
Cost as % of revenue calculated per category
Today
YoY trend visible — costs growing faster than revenue?
Today
Top 5 cost lines by absolute value identified
Today
Benchmark vs. prior year and sector average available
Today
CHECKLIST PHASE 2 OF 5

Cost Analysis

SELECT PHASE
0 of 5 completed 0%
Transaction-level detail pulled for top-5 cost lines
Week
Duplicate suppliers, contracts, or subscriptions identified
Week
Each major spend mapped to a business output
Week
Cost owners interviewed — their input captured
Week
Contracts reviewed — expiry dates and exit clauses noted
Week
CHECKLIST PHASE 3 OF 5

Prioritisation

SELECT PHASE
0 of 5 completed 0%
Each reduction opportunity scored: savings × speed × risk
Week
Quick wins (Week 1–4) separated from structural changes
Week
Customer impact assessed before any cut is approved
Week
Reversible vs. irreversible cuts clearly labelled
Week
90-day savings roadmap with targets per phase approved
Week
CHECKLIST PHASE 4 OF 5

Execution

SELECT PHASE
0 of 6 completed 0%
One named owner assigned per cost line
Monthly
Discretionary spend freeze confirmed and communicated
Monthly
Supplier renegotiations initiated with alternatives ready
Monthly
Cancelled contracts / subscriptions confirmed in writing
Monthly
Weekly tracking in place — actuals vs. savings target
Monthly
Savings visible in P&L within 30 days of action
Monthly
CHECKLIST PHASE 5 OF 5

Lock-In (Prevent Cost Creep)

SELECT PHASE
0 of 6 completed 0%
New cost baseline documented and approved
Ongoing
Budget system updated with new targets
Ongoing
Approval thresholds set for new spend
Ongoing
Monthly cost review cadence scheduled
Ongoing
Savings scorecard visible to leadership
Ongoing
Annual zero-based review date confirmed
Ongoing
KPI DASHBOARD CHECKLIST
CHECKLIST PHASE 1 OF 6

KPI Setup

Define KPIs, data sources, and dashboard access before go-live

SELECT PHASE
0 of 18 completed 0%
KPI Definition
Business goal confirmed and documented
Now
Max 5 KPIs per dimension selected
Now
Each KPI has a clear formula / definition
Now
Targets set per KPI (monthly / quarterly)
Now
RAG thresholds defined (red / amber / green)
Now
KPI Register completed and shared
Now
Data & Sources
Data source identified per KPI
Now
Owner assigned per KPI (one person)
Now
Update frequency confirmed per KPI
Now
Data entry method defined (manual / auto)
Now
Test run with historical data completed
Now
Data accuracy verified before go-live
Now
Dashboard & Access
Dashboard tool selected and set up
Now
Views created per audience (exec / team / ops)
Now
RAG colour coding applied and tested
Now
Access rights assigned to relevant users
Now
Review meeting cadence scheduled
Now
Go-live date confirmed and communicated
Now
CHECKLIST PHASE 2 OF 6

Daily

Ops / Sales lead — 10 min

SELECT PHASE
0 of 6 completed 0%
Orders received entered
Daily
Deliveries completed recorded
Daily
Complaints / escalations logged
Daily
Cash position updated (if tracked daily)
Daily
Any RED alerts flagged to owner
Daily
Data anomalies noted for review
Daily
CHECKLIST PHASE 3 OF 6

Weekly

Department owners — 30 min

SELECT PHASE
0 of 6 completed 0%
Revenue vs. weekly target updated
Weekly
Pipeline value and movement recorded
Weekly
WIP / backlog count updated
Weekly
Conversion rates calculated
Weekly
Open action items from last week reviewed
Weekly
Cost overruns / variances flagged
Weekly
CHECKLIST PHASE 4 OF 6

Monthly

Management — 60–90 min

SELECT PHASE
0 of 7 completed 0%
All KPIs updated with month-end actuals
Monthly
P&L aligned with KPI data
Monthly
DSO and cash flow reviewed
Monthly
3-month trend assessed per KPI
Monthly
Constraint identified and documented
Monthly
Action items assigned with deadlines
Monthly
Meeting notes and decisions recorded
Monthly
CHECKLIST PHASE 5 OF 6

Quarterly

Leadership — 2–3 hrs

SELECT PHASE
0 of 7 completed 0%
KPI set reviewed for continued relevance
Quarterly
Targets reset for next quarter
Quarterly
Permanently green KPIs replaced or raised
Quarterly
Dashboard structure updated if needed
Quarterly
Data sources and owners confirmed
Quarterly
KPI Register updated and archived
Quarterly
Strategic goals for next quarter aligned
Quarterly
CHECKLIST PHASE 6 OF 6

KPI Review Meeting Checklist — run this every time

SELECT PHASE
0 of 10 completed 0%
Before the meeting
Dashboard updated with latest actuals
Weekly
Previous meeting's action items checked
Weekly
RED KPIs identified and prioritised
Weekly
Supporting data available for red items
Weekly
Agenda distributed to attendees
Weekly
During & after the meeting
Open with red KPIs — not green ones
Weekly
Root cause identified per red item
Weekly
Action owner and deadline assigned per issue
Weekly
Trend discussed — not just current value
Weekly
Decisions and actions documented
Weekly
PRODUCTIVITY CHECKLIST
CHECKLIST PHASE 1 OF 5

Output Measurement

SELECT PHASE
0 of 4 completed 0%
Unit of output defined and agreed by management
Today
Actual output measured over last 4–8 weeks
Today
Full value chain mapped step by step
Today
Throughput time per step recorded (average + peak)
Today
CHECKLIST PHASE 2 OF 5

Constraint Identification

SELECT PHASE
0 of 4 completed 0%
Step with longest queue or most wait time identified
Week
Constraint utilisation measured — hours used vs. available
Week
Root causes of constraint slowdowns documented
Week
One named owner assigned to the constraint
Week
CHECKLIST PHASE 3 OF 5

Exploit — Squeeze Current Capacity

SELECT PHASE
0 of 4 completed 0%
Non-productive time removed from constraint schedule
Weekly
Input buffer in place — constraint never starved of work
Weekly
Non-constraint tasks offloaded from constraint resources
Weekly
Rework and defect rate at constraint tracked and reduced
Weekly
CHECKLIST PHASE 4 OF 5

Alignment — Subordinate the System

SELECT PHASE
0 of 4 completed 0%
Upstream steps paced to constraint speed — no faster
Weekly
Team KPIs updated — system output, not local efficiency
Weekly
All team leads briefed on constraint logic and why it matters
Weekly
Weekly output report in place — constraint owner reports first
Weekly
CHECKLIST PHASE 5 OF 5

Elevation & Cycle Repeat

SELECT PHASE
0 of 6 completed 0%
Capacity investment approved for constraint only
Monthly
Output increase confirmed before next investment
Monthly
Constraint shift monitored — new bottleneck identified
Monthly
Phase 1 measurement re-run after each elevation
Monthly
Monthly output baseline updated with new actuals
Monthly
Next improvement target set and communicated
Monthly
BUSINESS PERFORMANCE REVIEW CHECKLIST
CHECKLIST PHASE 1 OF 4

Financial

SELECT PHASE
0 of 7 completed 0%
Revenue vs. budget (€ & %)
Monthly
Gross margin per product/segment
Monthly
Cost overruns identified
Monthly
EBITDA vs. prior period
Monthly
Cash position & DSO
Monthly
Outstanding receivables >60 days
Monthly
Forecast updated for next period
Monthly
CHECKLIST PHASE 2 OF 4

Sales & Pipeline

SELECT PHASE
0 of 7 completed 0%
New orders vs. target
Monthly
Pipeline value & conversion rate
Monthly
Lost deals — reason logged
Monthly
Top 10 accounts reviewed
Monthly
New vs. repeat revenue split
Monthly
Sales activities vs. plan
Monthly
Price deviations / discounts logged
Monthly
CHECKLIST PHASE 3 OF 4

Operations

SELECT PHASE
0 of 7 completed 0%
On-time delivery rate
Monthly
Quality defects / returns
Monthly
Capacity utilisation
Monthly
Inventory levels vs. target
Monthly
Bottleneck status identified
Monthly
Supplier performance reviewed
Monthly
Open NCRs / corrective actions
Monthly
CHECKLIST PHASE 4 OF 4

People & Organisation

SELECT PHASE
0 of 7 completed 0%
Headcount vs. plan
Monthly
Absenteeism rate
Monthly
Open vacancies & hiring status
Monthly
Key person risks flagged
Monthly
Training completions on track
Monthly
Performance issues escalated
Monthly
Team pulse / morale noted
Monthly
RESTRUCTURING CHECKLIST
CHECKLIST PHASE 1 OF 4

Days 1–30

Are we going to survive next month? Stop the bleeding before restructuring anything.

SELECT PHASE
0 of 23 completed 0%
Cash & Liquidity
13-week cash flow model built and live
Now
All bank accounts consolidated in one daily view
Now
Non-essential spend frozen — purchasing authority centralized
Now
Accounts receivable aged list reviewed — recovery actions started
Now
Payment terms renegotiated with top 5 suppliers
Now
Cash runway calculated — weeks of operational coverage confirmed
Now
Creditor & Stakeholder Control
All creditors contacted proactively — before any default
Now
Bank relationships: current status confirmed, relationship manager informed
Now
Covenant breaches identified — waivers requested where needed
Now
Key investors/board aligned on the situation — no surprises
Now
Standstill agreements in place where full payment is not possible
Now
Legal counsel engaged — insolvency risk assessed
Now
Leadership & Decision Authority
One person unambiguously in charge of the turnaround
Now
Decision authority matrix drafted and published
Now
Daily standup established — 15 minutes, mandatory
Now
All major decisions documented — who decided, when, why
Now
Internal communication plan active — no rumour vacuum
Now
Information Baseline
Real P&L available — by product line and by client
Now
Gross margin per product/client calculated from actual data
Now
Full cost base mapped — fixed vs. variable identified
Now
Headcount and total employment cost confirmed per department
Now
Order book and pipeline reviewed — real revenue forecast built
Now
Management reports replaced with raw operational data
Now
CHECKLIST PHASE 2 OF 4

Days 30–90

Where does value get created — and where does it get destroyed?

SELECT PHASE
0 of 20 completed 0%
Constraint & Bottleneck
The primary constraint is named and agreed by leadership
Week
Constraint fully exploited — maximum output extracted from current capacity
Week
All non-constraint resources subordinated to protecting the constraint
Week
Investment in elevating the constraint justified and approved
Week
Next constraint anticipated — roadmap prepared for when current one breaks
Week
Portfolio Rationalization
Every product line classified: Keep / Fix / Exit
Week
Exit plan executed for loss-making lines — clients informed, transition managed
Week
Resources reallocated from exited lines to profitable ones
Week
Client concentration risk identified — dependency on top 3 clients quantified
Week
Non-core assets identified — sale or lease-back options evaluated
Week
Cost Structure
Cost reductions target costs that do not touch throughput
Week
Fixed cost base renegotiated — leases, service agreements, subscriptions
Week
Headcount decisions made — performers retained, underperformers addressed
Week
Savings tracked weekly against plan — actual cost reduction measured
Week
Impact of cost cuts on throughput assessed before every decision
Week
Supply Chain Stabilization
Critical suppliers identified — supply continuity secured for profitable lines
Week
Overdue supplier payments addressed — payment plans confirmed in writing
Week
Inventory reviewed — slow-moving or loss-making stock liquidated
Week
Single-source supplier risks mapped — alternatives identified where critical
Week
Payment terms extended with key suppliers — documented agreements
Week
CHECKLIST PHASE 3 OF 4

Months 3–6

Is the organization built to deliver results — or to maintain itself?

SELECT PHASE
0 of 18 completed 0%
Organization Design
New structure designed around strategy — not around existing people
Monthly
Management layers reduced — each layer owns decisions, not approvals
Monthly
Role clarity: every person knows what they own and what they decide
Monthly
People assessed against new roles — fit decisions made and communicated
Monthly
KPIs aligned with new structure — measuring output, not activity
Monthly
Financial Restructuring
Debt restructuring plan agreed with all major creditors
Monthly
Working capital management system operational — not just monitored
Monthly
New budget built around throughput — not last year's spend
Monthly
Refinancing completed or in formal negotiation
Monthly
Monthly financial reporting rhythm established — real numbers, on time
Monthly
People & Culture
Behaviours that caused the crisis identified and addressed directly
Monthly
High performers identified and retained — they know who they are
Monthly
Honest performance conversations held — no politics, no delay
Monthly
Team informed of restructuring progress — regularly, honestly
Monthly
Governance
Decision rights formally defined — every level knows its authority
Monthly
Board or investor aligned on recovery plan — milestones agreed
Monthly
Recovery KPIs reflect cash, throughput, and constraint progress
Monthly
Monthly plan validity review — is the strategy still correct?
Monthly
CHECKLIST PHASE 4 OF 4

Months 6–18

Why will this company grow — and who will care?

SELECT PHASE
0 of 9 completed 0%
Market Position
Specific target customer defined — not a market, a profile
Quarterly
Value proposition tested with real customers — not assumed
Quarterly
Competitive differentiation articulated — factual, not aspirational
Quarterly
Market size validated — is it large enough to sustain the business?
Quarterly
Revenue & Growth Engine
Pricing reviewed — reflects value delivered, not cost plus legacy
Quarterly
Recurring revenue model identified and being built
Quarterly
Sales pipeline visible, measured, and realistic
Quarterly
New client acquisition process repeatable — not dependent on one person
Quarterly
Dependency on top 1–2 clients actively reduced
Quarterly
CROSS-CULTURAL CHECKLIST
CHECKLIST PHASE 1 OF 4

Preparation

SELECT PHASE
0 of 8 completed 0%
Cultural Profiling
Communication context mapped
Today
Relationship orientation established
Today
Hierarchy and decision flow documented
Today
Face-saving norms understood
Today
Liaison & Brief
Time orientation confirmed
Today
Uncertainty avoidance level assessed
Today
Cultural Profile Brief completed
Today
Cultural liaison identified and briefed
Today
CHECKLIST PHASE 2 OF 4

Relationship Building

SELECT PHASE
0 of 7 completed 0%
Trust Investment
Minimum 2 non-commercial touchpoints
Week
Market Entry Lead attending personally
Week
Appropriate seniority matched
Week
Communication Adaptation
Meeting preparation note completed
Week
Pitch or proposal adapted
Week
Silence protocol understood
Week
Public confrontation avoided
Week
CHECKLIST PHASE 3 OF 4

Commitment & Validation

SELECT PHASE
0 of 6 completed 0%
Agreement Confirmation
Written meeting summary sent within 24h
Week
Written confirmation requested
Week
Silence treated as non-confirmation
Week
Follow-Up Protocol
Follow-up is by phone, not email
Week
Cultural liaison consulted
Week
Non-response pattern documented
Week
CHECKLIST PHASE 4 OF 4

Internal Alignment

SELECT PHASE
0 of 5 completed 0%
Team Training
Cultural awareness training completed
Week
Training updated
Week
Training completion records maintained
Week
HQ Behaviour Check
HQ respects local timing advice
Week
Local team input is acted on
Week
DEALER ON-BOARDING CHECKLIST
CHECKLIST PHASE 1 OF 6

Select — Profile & Qualification

SELECT PHASE
0 of 6 completed 0%
Dealer Profile Definition
Ideal dealer profile documented
Week
Product price list confirmed
Week
Regulatory requirements confirmed
Week
Candidate Identification & Scoring
4–6 candidates identified
Week
Qualification scorecard completed
Week
Top 3 shortlisted
Week
CHECKLIST PHASE 2 OF 6

Agree — Commercial Agreement

SELECT PHASE
0 of 7 completed 0%
Agreement Contents
Territory defined
Week
Volume targets set
Week
Pricing and margin confirmed
Week
Exclusivity terms agreed
Week
Agreement Sign-Off
Sell-out reporting obligation written in
Week
Review cadence and exit conditions
Week
Named dealer contact identified
Week
CHECKLIST PHASE 3 OF 6

Train — Knowledge Transfer

SELECT PHASE
0 of 6 completed 0%
Training Completion
Level 1 training completed
Week
Product application use cases covered
Week
Completion tracked individually
Week
Sales Readiness
Competitive positioning covered
Week
Pricing and quoting logic understood
Week
Local-language materials confirmed available
Week
CHECKLIST PHASE 4 OF 6

Equip — Tools & Access

SELECT PHASE
0 of 6 completed 0%
Operational Tools
Ordering system access confirmed
Week
Price list and margin calculator provided
Week
Product platform (PWA) access granted
Week
Support Access
Marketing materials provided
Week
Escalation and support contacts confirmed
Week
After-sales and spare parts access confirmed
Week
CHECKLIST PHASE 5 OF 6

First Sale — Quick Win Support

SELECT PHASE
0 of 5 completed 0%
Target Account Planning
3–5 target accounts identified jointly
Week
First customer visit scheduled
Week
Demo unit or reference case available
Week
First Sale Confirmation
First proposal co-created
Week
First confirmed end-customer sale documented
Week
CHECKLIST PHASE 6 OF 6

Manage — Performance & Visibility

SELECT PHASE
0 of 6 completed 0%
Sell-Out Tracking
Monthly sell-out data received
Monthly
Reorder confirmed within 60 days
Monthly
Pipeline activity tracked
Monthly
Structured Reviews
Monthly touchpoint held
Monthly
Platform usage reviewed
Monthly
Quarterly scorecard completed
Monthly
DISTRIBUTOR DEVELOPMENT CHECKLIST
CHECKLIST PHASE 1 OF 5

Find — Identify & Qualify

SELECT PHASE
0 of 7 completed 0%
Market Readiness (Pre-Search Gate)
EUR price list confirmed
Week
Regulatory clearance confirmed
Week
Positioning brief approved
Week
Candidate Identification & Scoring
5–8 candidates identified
Week
Qualification scorecard completed
Week
Top 3 shortlisted
Week
Qualification call completed
Week
CHECKLIST PHASE 2 OF 5

Activate — Onboard & First Order

SELECT PHASE
0 of 6 completed 0%
Commercial Agreement
Commercial agreement signed
Week
Sell-out reporting obligation
Week
Named distributor contact identified
Week
First Order & Ramp Plan
First order placed and received
Week
30/60/90 day ramp plan agreed
Week
Platform access and QR codes
Week
CHECKLIST PHASE 3 OF 5

Enable — Train & Equip

SELECT PHASE
0 of 6 completed 0%
Training Completion
Level 1 training completed
Week
Product demonstration completed
Week
Training completion tracked
Week
Sales Tools & Materials
Sales materials available
Week
Platform walkthrough completed
Week
Joint customer visit planned
Week
CHECKLIST PHASE 4 OF 5

Measure — Track Sell-Out & Performance

SELECT PHASE
0 of 6 completed 0%
Sell-Out & Data Tracking
Monthly sell-out data received
Monthly
Pipeline visibility confirmed
Monthly
Stock levels monitored
Monthly
Structured Reviews
Monthly touchpoint held
Monthly
Platform usage reviewed
Monthly
Quarterly scorecard completed
Monthly
CHECKLIST PHASE 5 OF 5

Scale — Replicate & Expand

SELECT PHASE
0 of 5 completed 0%
Playbook & Next Market
Distributor playbook documented
Quarterly
Performing model confirmed
Quarterly
Gate 3 confirmed
Quarterly
Recovery & Replacement
Recovery plan activated
Quarterly
Replacement initiated
Quarterly
INTERNATIONAL PARTNERSHIPS CHECKLIST
CHECKLIST PHASE 1 OF 5

Assess — Internal Readiness

SELECT PHASE
0 of 6 completed 0%
Commercial Foundation
Price list confirmed
Today
Regulatory clearance confirmed
Today
Value proposition approved
Today
Exclusivity & Terms Readiness
Exclusivity position confirmed
Today
Minimum activity targets defined
Today
Internal resourcing confirmed
Today
CHECKLIST PHASE 2 OF 5

Select — Identify & Qualify

SELECT PHASE
0 of 7 completed 0%
Partner Longlist
5–8 candidates identified
Week
Each candidate assessed
Week
Portfolio conflicts identified
Week
Longlist reviewed and approved
Week
Qualification & Shortlist
Qualification scorecard completed
Week
Qualification call held
Week
Top 3 shortlisted
Week
CHECKLIST PHASE 3 OF 5

Agree — Structure & Sign

SELECT PHASE
0 of 6 completed 0%
Agreement Content
Partnership agreement signed
Week
Sell-through reporting obligation
Week
Customer data ownership confirmed
Week
Governance Setup
Named partner contact confirmed
Week
Review cadence agreed
Week
Performance trigger points defined
Week
CHECKLIST PHASE 4 OF 5

Activate — Enable & Launch

SELECT PHASE
0 of 6 completed 0%
Partner Enablement
Level 1 training completed
Week
Digital platform access deployed
Week
Sales materials confirmed available
Week
Joint Launch
Joint launch plan agreed
Week
First co-executed customer call or demo
Week
First transaction facilitated and confirmed
Week
CHECKLIST PHASE 5 OF 5

Manage — Track, Review & Decide

SELECT PHASE
0 of 6 completed 0%
Ongoing Performance Tracking
Monthly sell-through data received
Monthly
Pipeline visibility confirmed
Monthly
Platform usage reviewed
Monthly
Structured Reviews & Decisions
Monthly touchpoint held
Monthly
Inactivity trigger respected
Monthly
Quarterly scorecard completed
Monthly
MARKET ENTRY CHECKLIST
CHECKLIST PHASE 1 OF 5

Market Visibility

SELECT PHASE
0 of 7 completed 0%
Market Intelligence
Buyer profile identified
Week
Problem your product solves
Week
Price expectations
Week
Competitive landscape
Week
Go / No-Go Decision
Purchase process mapped
Week
Regulatory requirements
Week
Go/No-Go decision
Week
CHECKLIST PHASE 2 OF 5

Entry Route

SELECT PHASE
0 of 6 completed 0%
Channel Model
Direct vs. indirect decision
Week
Exclusivity terms
Week
Partner qualification criteria
Week
Partner Selection
5–8 candidates identified
Week
Top candidate committed
Week
Commercial agreement signed
Week
CHECKLIST PHASE 3 OF 5

Demand Activation

SELECT PHASE
0 of 6 completed 0%
Pull Creation
Local-language positioning
Week
Reference customer or proof point
Week
Level 1 partner training
Week
Sell-Out Tracking
Sell-out reporting method
Week
Trade show or visibility event
Week
End-user demand plan
Week
CHECKLIST PHASE 4 OF 5

Commercial Flow

SELECT PHASE
0 of 6 completed 0%
Pricing & Compliance
Local pricing validated
Monthly
Import/regulatory requirements
Monthly
Currency risk
Monthly
Logistics & After-Sales
Lead times confirmed
Monthly
After-sales and warranty
Monthly
Logistics chain tested
Monthly
CHECKLIST PHASE 5 OF 5

Scale & Control

SELECT PHASE
0 of 5 completed 0%
Visibility & Review
Monthly review cadence
Monthly
One constraint identified
Monthly
Partner performance scorecard
Monthly
Scale Decision at Month 6
Model proven
Monthly
Expand / deepen / exit decision
Monthly
CHANGE LEADERSHIP CHECKLIST
CHECKLIST PHASE 1 OF 4

Before Launching the Change

SELECT PHASE
0 of 12 completed 0%
Problem Diagnosis
Root cause identified
Today
Evidence documented
Today
Gap is quantified
Today
Key leaders agree on the problem
Today
Direction & Scope
Desired outcome is specific
Today
Scope is bounded
Today
Priority is clear
Today
Written and shared
Today
Coalition & Readiness
Early adopters identified
Today
Middle management engaged
Today
Negative consequences mapped
Today
Communication plan exists
Today
CHECKLIST PHASE 2 OF 4

Launching and Executing the Change

SELECT PHASE
0 of 10 completed 0%
Communication & Conviction
The "why" has been communicated — repeatedly
Week
People can explain the change in their own words
Week
Resistance is being addressed with logic
Week
Early wins are communicated immediately
Week
Leader is visible in the change
Week
Watch for These Failure Signals
Middle layer is silent
Week
Surface compliance only
Week
No early wins after 30 days
Week
The old behaviour is still being rewarded
Week
Change fatigue visible
Week
CHECKLIST PHASE 3 OF 4

Monitoring and Adjusting

SELECT PHASE
0 of 8 completed 0%
Progress Check
Progress measured against defined outcomes
Weekly
Blockers identified and removed
Weekly
Coalition is holding
Weekly
Correction happens fast
Weekly
Sustaining Leadership Behaviour
Leader has not declared victory too early
Weekly
Attention has not shifted to the next initiative
Weekly
Resistance is still being tracked
Weekly
New people are being onboarded into the change
Weekly
CHECKLIST PHASE 4 OF 4

Anchoring and Close-Out

SELECT PHASE
0 of 6 completed 0%
Embedding the Change — It Is Not Done Until This Is Done
New behaviour in metrics
Monthly
Incentives aligned
Monthly
Processes and SOPs updated
Monthly
Leadership behaviour is consistent
Monthly
Outcomes confirmed and communicated
Monthly
Lessons captured
Monthly
DELEGATION CHECKLIST
CHECKLIST PHASE 1 OF 4

Before You Delegate

SELECT PHASE
0 of 12 completed 0%
Outcome Clarity
Result is defined
Today
Deadline is set
Today
Quality standard is stated
Today
Written down
Today
Capability Check
Skills match the task
Today
Time is available
Today
Tools and access confirmed
Today
Gaps are addressed
Today
Authority & Boundaries
Decision authority stated
Today
Escalation triggers defined
Today
Stakeholders informed
Today
Budget limits clarified
Today
CHECKLIST PHASE 2 OF 4

The Hand-Off Conversation

SELECT PHASE
0 of 10 completed 0%
What to Cover in the Briefing
State the why
Today
Confirm understanding
Today
Agree on check-in schedule
Today
Open for questions
Today
Written confirmation sent
Today
Signals the Hand-Off Was Incomplete
No confirmation received
Today
First question within 24h
Today
No plan from the delegate
Today
Authority dispute
Today
Delegate routing back
Today
CHECKLIST PHASE 3 OF 4

During Execution

SELECT PHASE
0 of 8 completed 0%
Check-In Protocol
Progress confirmed at first check-in
Weekly
No unnecessary contact between check-ins
Weekly
Blockers surfaced early
Weekly
Leader not re-doing delegated work
Weekly
Watch for These Failure Signals
Radio silence
Weekly
Scope creep from the delegate
Weekly
Workarounds without notification
Weekly
Quality issues appearing
Weekly
CHECKLIST PHASE 4 OF 4

Close-Out

SELECT PHASE
0 of 6 completed 0%
Closing the Delegation Loop
Outcome confirmed
Week
Stakeholders notified
Week
Debrief completed
Week
Feedback given to delegate
Week
Learning captured
Week
Delegate capability recorded
Week
DIFFICULT CONVERSATIONS CHECKLIST
CHECKLIST PHASE 1 OF 4

Preparation (24–48 hours before)

SELECT PHASE
0 of 7 completed 0%
Defined the specific issue in one factual sentence (observable behavior, not interpretation)
Today
Gathered supporting evidence: dates, examples, data, emails, output
Today
Clarified the desired outcome — what specifically needs to change, and by when
Today
Reflected on my own contribution: unclear expectations, missing support, late feedback
Today
Consulted HR if conversation may result in formal action (PIP, warning, structural change)
Today
Booked a private room — no open space, at least 45 minutes, no interruptions
Today
Notified the employee in advance that a structured conversation will take place
Today
CHECKLIST PHASE 2 OF 4

Opening (first 5 minutes)

SELECT PHASE
0 of 4 completed 0%
Stated the purpose clearly: "I want to talk about X — this is a structured conversation"
Today
Confirmed the employee is able to have this conversation now (not under immediate duress)
Today
Kept tone calm and factual — not apologetic, not aggressive
Today
Avoided softening the message to the point where the issue becomes unclear
Today
CHECKLIST PHASE 3 OF 4

Core Conversation (15–25 minutes)

SELECT PHASE
0 of 6 completed 0%
Stated the observed facts first — specific, dated, behavioral. No conclusions yet.
Today
Named the business or team impact clearly — specific consequence, not general concern
Today
Asked for their view before defending my own. Used open questions, then stopped talking.
Today
Listened without interrupting. Let silence exist if needed.
Today
Acknowledged valid points they raised. Did not dismiss or minimize their perspective.
Today
Stayed on the defined issue — did not expand into other topics or historical grievances
Today
CHECKLIST PHASE 4 OF 4

Close & Commit (final 10 minutes)

SELECT PHASE
0 of 5 completed 0%
Summarized what was discussed and what was agreed — in plain language, without ambiguity
Today
Defined a specific, measurable change — not "do better" but what, by when, measured how
Today
Confirmed mutual understanding: "Do we agree on this? Is anything unclear?"
Today
Set a specific follow-up date — not "we'll check in" but a date in the calendar
Today
Sent written summary of agreed actions within 24 hours of the conversation
Today
MEETING EFFECTIVENESS CHECKLIST
CHECKLIST PHASE 1 OF 4

Before the Meeting

SELECT PHASE
0 of 12 completed 0%
Outcome & Purpose
Outcome defined in one sentence
Today
Question is named, not the subject
Today
No outcome = meeting cancelled
Today
Outcome cannot be resolved by email
Today
Attendees
Decision-maker is attending
Today
Only essential people invited
Today
Roles are clear
Today
Chair is confirmed
Today
Pre-Read & Agenda
Pre-read sent 24h before
Today
Agenda lists outcome + time slot
Today
Previous action items reviewed
Today
Duration is set and appropriate
Today
CHECKLIST PHASE 2 OF 4

During the Meeting

SELECT PHASE
0 of 10 completed 0%
Running the Session
Opened with the outcome — not introductions
Today
Previous actions reviewed first
Today
Blocking constraint named
Today
Discussion stays on cause — not symptoms
Today
Time tracked by the chair
Today
Decision & Action Assignment
Decision is stated explicitly
Today
Every action has one named owner
Today
Every action has a specific date
Today
Actions read back before close
Today
Deferred items have a reason and date
Today
CHECKLIST PHASE 3 OF 4

Warning Signals — The Meeting Is Failing

SELECT PHASE
0 of 8 completed 0%
During the Session
30 minutes in — no decision in sight
Always
Same issue raised for the second time
Always
Decision-maker is silent or absent
Always
Discussion is on data that should have been pre-read
Always
After the Session
No summary sent within 2 hours
Always
Actions from last meeting still open
Always
Another meeting scheduled to resolve this one
Always
Participants unsure who owns what
Always
CHECKLIST PHASE 4 OF 4

After the Meeting

SELECT PHASE
0 of 6 completed 0%
Close-Out — Required Within 2 Hours
Summary sent to all attendees
Today
Absent stakeholders notified
Today
Action log updated
Today
Next meeting date set only if needed
Today
Outcome measured at delivery date
Today
Process gaps captured
Today
TEAM MANAGEMENT CHECKLIST
CHECKLIST PHASE 1 OF 4

Diagnose: What to Change

SELECT PHASE
0 of 12 completed 0%
Identify the Constraint
One limiting factor named
Week
Root cause, not symptom
Week
Observations from the floor
Week
Priority communicated
Week
Team Chain Check
Shared goal confirmed
Week
Roles clear
Week
Decision flow fast
Week
Problems surface early
Week
Leader Blind Spots
Not fixing ten things at once
Week
Not confusing activity with output
Week
Not bypassing the constraint
Week
Not assuming the cause
Week
CHECKLIST PHASE 2 OF 4

Direction: What to Change It To

SELECT PHASE
0 of 10 completed 0%
Define the Desired State
Outcome is specific and measurable
Week
Finish line visible to the team
Week
Target date agreed
Week
Dependencies mapped
Week
Current delivery protected
Week
Resolve Apparent Conflicts
Conflict identified
Week
Underlying assumption challenged
Week
Both needs preserved
Week
Resolution path agreed
Week
Stakeholders aligned
Week
CHECKLIST PHASE 3 OF 4

Execute: How to Cause the Change

SELECT PHASE
0 of 8 completed 0%
Constraint Management
Maximum output from current resources
Weekly
All activities subordinated
Weekly
Elevation plan in place
Weekly
Time buffer protected
Weekly
Transition Planning
Resistance identified
Weekly
Change steps sequenced
Weekly
One owner assigned
Weekly
First check-in date set
Weekly
CHECKLIST PHASE 4 OF 4

Review & Improve

SELECT PHASE
0 of 6 completed 0%
Closing the Improvement Cycle
Throughput measured
Monthly
Waiting time reduced
Monthly
Constraint resolved
Monthly
Feedback given
Monthly
Next constraint named
Monthly
Team capability updated
Monthly
LEAN BASICS CHECKLIST
CHECKLIST PHASE 1 OF 4

Start of Shift

SELECT PHASE
0 of 12 completed 0%
Workspace
Workspace clear and free of obstructions
Daily
Required materials present and checked
Daily
Tools at designated locations
Daily
Open actions from previous shift known
Daily
Equipment
Visual inspection completed
Daily
Safety systems functional
Daily
Fluid levels checked
Daily
Safety equipment available
Daily
Planning
Day plan known
Daily
Team briefed
Daily
No information gaps
Daily
Previous shift incidents reviewed
Daily
CHECKLIST PHASE 2 OF 4

End of Shift

SELECT PHASE
0 of 10 completed 0%
Close-Out
Workspace cleaned and tidied (5S)
Daily
Machines off or in standby per procedure
Daily
Active orders registered in system
Daily
Deviations logged
Daily
Materials returned to fixed locations
Daily
Signals the Shift Was Not Closed Properly
Next shift discovers unexpected issues
Daily
Workspace requires cleaning before starting
Daily
Orders in an unknown state
Daily
Equipment issues discovered at start
Daily
Materials missing or misplaced
Daily
CHECKLIST PHASE 3 OF 4

Shift Handover

SELECT PHASE
0 of 9 completed 0%
What to Hand Over
Status of active orders communicated
Daily
Deviations reported verbally and in writing
Daily
Open actions transferred with deadline
Daily
Machine log updated
Daily
Incoming shift has access to all information
Daily
Signals the Handover Was Incomplete
Incoming shift calls the outgoing person
Daily
Next shift discovers a problem with no context
Daily
Actions without owners
Daily
Machine log entries missing
Daily
CHECKLIST PHASE 4 OF 4

Incident Response

SELECT PHASE
0 of 6 completed 0%
First Steps After an Incident or Deviation
Safety secured first
Always
Production stopped if necessary
Always
Supervisor informed immediately
Always
Situation documented
Always
Incident form completed within 24 hours
Always
Action owner and deadline set
Always
MAINTENANCE CHECKLIST
CHECKLIST PHASE 1 OF 4

Daily Inspection — Production Line

SELECT PHASE
0 of 6 completed 0%
Verify no active fault codes or warning lights on control panel before start-up
Daily
Check oil level — must be between MIN and MAX marks. Top up if below MIN.
Daily
Inspect drive belts and chains — no fraying, cracks, or excessive slack
Daily
Check coolant level and temperature reading at idle (target: 75–85°C)
Daily
Listen for unusual noise or vibration during first 5 minutes of operation
Daily
Confirm safety guards in place and all emergency stop buttons functional
Daily
CHECKLIST PHASE 2 OF 4

Monthly PM — Compressor C-04

SELECT PHASE
0 of 6 completed 0%
Apply LOTO: isolate power at CB-07, apply personal lock, verify zero energy state
Monthly
Replace inlet air filter — part number F-2214. Dispose of used filter correctly.
Monthly
Check and record oil level. Change if sample is dark or viscosity is out of spec.
Monthly
Inspect all hose connections — no cracks, leaks, or loose fittings
Monthly
Clean heat exchanger fins — remove debris with compressed air
Monthly
Record all readings in CMMS and set next PM date. Sign off task card.
Monthly
CHECKLIST PHASE 3 OF 4

Breakdown Response — Initial Steps

SELECT PHASE
0 of 6 completed 0%
Confirm area is safe before approaching failed equipment — check for leaks, sparks, smoke
Always
Stop production on affected line. Do not attempt to restart without diagnosis.
Always
Log the breakdown: time, equipment ID, observed symptom, last known good state
Always
Notify maintenance supervisor — do not attempt repair without authorisation on critical assets
Always
Collect evidence: fault codes, photographs, operator observations before disassembly
Always
Confirm LOTO applied before any maintenance work begins
Always
CHECKLIST PHASE 4 OF 4

Shift Handover — Maintenance

SELECT PHASE
0 of 6 completed 0%
List all equipment that has been worked on during the shift — status at handover
Daily
Report any open faults: symptom, diagnosis progress, parts ordered or outstanding
Daily
Flag any equipment returned to service with temporary fix — specify action required
Daily
Confirm safety isolations: all LOTO locks removed or handed over with written transfer
Daily
Report any near-misses, safety observations, or PPE issues from the shift
Daily
Sign both outgoing and incoming technician on the handover record
Daily
PROCESS IMPROVEMENT CHECKLIST
CHECKLIST PHASE 1 OF 4

Daily Operations

SELECT PHASE
0 of 14 completed 0%
Opening Check
Security log checked and signed
Daily
Storage zones verified
Daily
Inbound schedule confirmed
Daily
Equipment available
Daily
Team briefed on priorities
Daily
Shift Execution
Work follows the priority list
Daily
Deviations reported immediately
Daily
Process followed per SOP
Daily
Orders updated in real time
Daily
Mid-shift blockers surfaced early
Daily
Closing Check
All orders updated in system
Daily
Area cleaned and secured
Daily
Deviations logged
Daily
Handover prepared
Daily
CHECKLIST PHASE 2 OF 4

Process Execution

SELECT PHASE
0 of 10 completed 0%
Before Starting a Process
Order confirmed in system
Weekly
Stock availability verified
Weekly
SOP available at point of work
Weekly
Required equipment and tools ready
Weekly
Operator qualified for this process
Weekly
During Execution
Each step verified before moving to next
Weekly
Pick verified against order before packing
Weekly
Labels checked: address, barcode, quantity
Weekly
Order closed in system at completion
Weekly
Any deviation documented immediately
Weekly
CHECKLIST PHASE 3 OF 4

Project & Launch: Go / No-Go

SELECT PHASE
0 of 10 completed 0%
Go Criteria — All Must Be Met
Quality approval on file
Week
Pricing confirmed in system
Week
Team trained
Week
Materials distributed
Week
Minimum stock in place
Week
No-Go Triggers — Any One Stops the Launch
Quality approval missing or conditional
Week
Pricing not confirmed
Week
Stock below minimum
Week
Key team not trained
Week
Regulatory or legal requirement not met
Week
CHECKLIST PHASE 4 OF 4

Compliance & Audit

SELECT PHASE
0 of 6 completed 0%
Monthly Compliance Audit — Key Items
Fire exits clear
Quarterly
Hazardous materials stored correctly
Quarterly
Equipment calibration current
Quarterly
Random stock count completed
Quarterly
Incident log reviewed
Quarterly
Audit report signed and filed
Quarterly
QUALITY CHECKLIST
CHECKLIST PHASE 1 OF 4

Incoming Inspection

SELECT PHASE
0 of 12 completed 0%
Documentation Check
Delivery note matches purchase order
Always
Material certificate on file
Always
Labeling complete
Always
Batch number and inspector recorded
Always
Physical Inspection
Packaging integrity checked
Always
Sample dimensions measured
Always
Surface condition verified
Always
Weight or quantity spot-checked
Always
Rejection Protocol
Reject before goods enter stock
Always
Supplier notified immediately
Always
NCR number assigned
Always
Replacement or disposition agreed
Always
CHECKLIST PHASE 2 OF 4

In-Process Control

SELECT PHASE
0 of 8 completed 0%
At Start of Production Run
Setup parameters match production order
Daily
First-article inspection complete
Daily
In-process measurement plan in place
Daily
Control limits posted at workstation
Daily
During the Run
Operator stops if parameter exceeds limit
Daily
Scrap and rework isolated immediately
Daily
Process parameters logged each shift
Daily
Deviations reported and actioned
Daily
CHECKLIST PHASE 3 OF 4

Final Inspection & Release

SELECT PHASE
0 of 11 completed 0%
Release Criteria — All Must Be Met
All in-process records complete
Always
Dimensional check on final product
Always
Functional test passed
Always
Cosmetic inspection clean
Always
Packaging verified
Always
Release stamp applied
Always
Hold Triggers — Any One Stops Release
In-process records incomplete
Always
Dimensional non-conformance
Always
Functional test failed or not performed
Always
Known rework in the batch
Always
Customer-specific requirement not verified
Always
CHECKLIST PHASE 4 OF 4

Customer Complaint Handling

SELECT PHASE
0 of 6 completed 0%
Complaint Response — Every Step Logged
Complaint logged within the hour
Always
Response to customer within 24 hours
Always
Affected batch quarantined
Always
Root cause analysis initiated
Always
Corrective action assigned
Always
Complaint closed with verification
Always
WASTE REDUCTION CHECKLIST
CHECKLIST PHASE 1 OF 4

Gemba Walk — Waste Identification

SELECT PHASE
0 of 12 completed 0%
Overproduction & Inventory
Output stacking up
Weekly
WIP between steps
Weekly
Excess materials at station
Weekly
Storage growing
Weekly
Waiting & Motion
Operators waiting
Weekly
Unnecessary walking
Weekly
Reaching and searching
Weekly
Materials transported twice
Weekly
Defects & Extra Processing
Rework in progress
Weekly
Inspection as a process step
Weekly
Steps the customer does not value
Weekly
Unused skills
Weekly
CHECKLIST PHASE 2 OF 4

Process Review — 8 Waste Scan

SELECT PHASE
0 of 14 completed 0%
The 8 Waste Types (DOWNTIME)
Defects
Monthly
Overproduction
Monthly
Waiting
Monthly
Non-utilized talent
Monthly
Transportation
Monthly
Inventory
Monthly
Motion
Monthly
Extra processing
Monthly
Value Stream Mapping — Preparation
Process boundaries defined
Monthly
Right team assembled
Monthly
Cycle times available
Monthly
Inventory counted
Monthly
Customer demand confirmed
Monthly
Known waste areas flagged
Monthly
CHECKLIST PHASE 3 OF 4

Daily Shift & Setup Checks

SELECT PHASE
0 of 10 completed 0%
Daily Shift — Waste Quick-Scan
No defects carried forward
Daily
Workstation clear
Daily
Tools at designated locations
Daily
No pending information gaps
Daily
Yesterday's observations reviewed
Daily
Setup & Changeover — Waste Check
Preparation complete before machine stops
Daily
Internal vs. external activities separated
Daily
Unnecessary movement noted
Daily
Actual time recorded
Daily
First-pass yield at restart
Daily
CHECKLIST PHASE 4 OF 4

Workspace Layout & Checklist Design Rules

SELECT PHASE
0 of 6 completed 0%
Motion, Transport & Design Standards
Operator travel distance measured
Now
Frequently used items within reach
Now
Materials flow in one direction
Now
Visual indicators in place
Now
Facts, not opinions
Now
Every observation leads somewhere
Now
SOP LIBRARY CHECKLIST
CHECKLIST PHASE 1 OF 3

Section A — Document Structure

SELECT PHASE
0 of 10 completed 0%
Mandatory Fields
Document number
Now
Version number
Now
Effective date
Now
Review date
Now
Approval signature
Now
Content Completeness
Purpose
Now
Scope
Now
Roles and responsibilities
Now
Step-by-step procedure
Now
Output per step
Now
CHECKLIST PHASE 2 OF 3

Section B — Ownership & Currency

SELECT PHASE
0 of 8 completed 0%
Ownership
Named Process Owner
Quarterly
Process Owner confirmed aware
Quarterly
Backup/deputy
Quarterly
Review date tracked
Quarterly
Accuracy & Currency
Reviewed by someone who currently performs the process
Quarterly
All system names, tool names, and form references
Quarterly
No steps reference retired processes
Quarterly
Exceptions and escalation paths
Quarterly
CHECKLIST PHASE 3 OF 3

Section C — Usability & Quality

SELECT PHASE
0 of 10 completed 0%
Usability Test
A new team member
Quarterly
Each step has one clear action
Quarterly
Decision points
Quarterly
Known exceptions
Quarterly
Language is plain
Quarterly
Library Integration
SOP registered
Quarterly
Cross-references
Quarterly
Previous version archived
Quarterly
Onboarding materials
Quarterly
Team leads informed
Quarterly
RESTRUCTURING CHECKLIST
CHECKLIST PHASE 1 OF 4

Days 1–30

Are we going to survive next month? Stop the bleeding before restructuring anything.

SELECT PHASE
0 of 23 completed 0%
Cash & Liquidity
13-week cash flow model built and live
Now
All bank accounts consolidated in one daily view
Now
Non-essential spend frozen — purchasing authority centralized
Now
Accounts receivable aged list reviewed — recovery actions started
Now
Payment terms renegotiated with top 5 suppliers
Now
Cash runway calculated — weeks of operational coverage confirmed
Now
Creditor & Stakeholder Control
All creditors contacted proactively — before any default
Now
Bank relationships: current status confirmed, relationship manager informed
Now
Covenant breaches identified — waivers requested where needed
Now
Key investors/board aligned on the situation — no surprises
Now
Standstill agreements in place where full payment is not possible
Now
Legal counsel engaged — insolvency risk assessed
Now
Leadership & Decision Authority
One person unambiguously in charge of the turnaround
Now
Decision authority matrix drafted and published
Now
Daily standup established — 15 minutes, mandatory
Now
All major decisions documented — who decided, when, why
Now
Internal communication plan active — no rumour vacuum
Now
Information Baseline
Real P&L available — by product line and by client
Now
Gross margin per product/client calculated from actual data
Now
Full cost base mapped — fixed vs. variable identified
Now
Headcount and total employment cost confirmed per department
Now
Order book and pipeline reviewed — real revenue forecast built
Now
Management reports replaced with raw operational data
Now
CHECKLIST PHASE 2 OF 4

Days 30–90

Where does value get created — and where does it get destroyed?

SELECT PHASE
0 of 20 completed 0%
Constraint & Bottleneck
The primary constraint is named and agreed by leadership
Week
Constraint fully exploited — maximum output extracted from current capacity
Week
All non-constraint resources subordinated to protecting the constraint
Week
Investment in elevating the constraint justified and approved
Week
Next constraint anticipated — roadmap prepared for when current one breaks
Week
Portfolio Rationalization
Every product line classified: Keep / Fix / Exit
Week
Exit plan executed for loss-making lines — clients informed, transition managed
Week
Resources reallocated from exited lines to profitable ones
Week
Client concentration risk identified — dependency on top 3 clients quantified
Week
Non-core assets identified — sale or lease-back options evaluated
Week
Cost Structure
Cost reductions target costs that do not touch throughput
Week
Fixed cost base renegotiated — leases, service agreements, subscriptions
Week
Headcount decisions made — performers retained, underperformers addressed
Week
Savings tracked weekly against plan — actual cost reduction measured
Week
Impact of cost cuts on throughput assessed before every decision
Week
Supply Chain Stabilization
Critical suppliers identified — supply continuity secured for profitable lines
Week
Overdue supplier payments addressed — payment plans confirmed in writing
Week
Inventory reviewed — slow-moving or loss-making stock liquidated
Week
Single-source supplier risks mapped — alternatives identified where critical
Week
Payment terms extended with key suppliers — documented agreements
Week
CHECKLIST PHASE 3 OF 4

Months 3–6

Is the organization built to deliver results — or to maintain itself?

SELECT PHASE
0 of 18 completed 0%
Organization Design
New structure designed around strategy — not around existing people
Monthly
Management layers reduced — each layer owns decisions, not approvals
Monthly
Role clarity: every person knows what they own and what they decide
Monthly
People assessed against new roles — fit decisions made and communicated
Monthly
KPIs aligned with new structure — measuring output, not activity
Monthly
Financial Restructuring
Debt restructuring plan agreed with all major creditors
Monthly
Working capital management system operational — not just monitored
Monthly
New budget built around throughput — not last year's spend
Monthly
Refinancing completed or in formal negotiation
Monthly
Monthly financial reporting rhythm established — real numbers, on time
Monthly
People & Culture
Behaviours that caused the crisis identified and addressed directly
Monthly
High performers identified and retained — they know who they are
Monthly
Honest performance conversations held — no politics, no delay
Monthly
Team informed of restructuring progress — regularly, honestly
Monthly
Governance
Decision rights formally defined — every level knows its authority
Monthly
Board or investor aligned on recovery plan — milestones agreed
Monthly
Recovery KPIs reflect cash, throughput, and constraint progress
Monthly
Monthly plan validity review — is the strategy still correct?
Monthly
CHECKLIST PHASE 4 OF 4

Months 6–18

Why will this company grow — and who will care?

SELECT PHASE
0 of 9 completed 0%
Market Position
Specific target customer defined — not a market, a profile
Quarterly
Value proposition tested with real customers — not assumed
Quarterly
Competitive differentiation articulated — factual, not aspirational
Quarterly
Market size validated — is it large enough to sustain the business?
Quarterly
Revenue & Growth Engine
Pricing reviewed — reflects value delivered, not cost plus legacy
Quarterly
Recurring revenue model identified and being built
Quarterly
Sales pipeline visible, measured, and realistic
Quarterly
New client acquisition process repeatable — not dependent on one person
Quarterly
Dependency on top 1–2 clients actively reduced
Quarterly
CUSTOMER RETENTION CHECKLIST
CHECKLIST PHASE 1 OF 4

Onboard

SELECT PHASE
0 of 6 completed 0%
Named CSM assigned before kickoff call
Today
Kickoff call held within 5 business days
Today
First value milestone agreed
Today
Onboarding blockers identified early
Today
Customer's key stakeholders mapped
Today
First value milestone achieved and documented
Today
CHECKLIST PHASE 2 OF 4

Monitor

SELECT PHASE
0 of 6 completed 0%
Usage or engagement data reviewed monthly
Monthly
Support ticket trend checked
Monthly
Accounts non-responsive for 14+ days contacted via alternate channel
Monthly
NPS or satisfaction score reviewed where tracked
Monthly
At-risk accounts have a named save-motion owner
Monthly
Proactive outreach completed on cadence schedule
Monthly
CHECKLIST PHASE 3 OF 4

Review

SELECT PHASE
0 of 6 completed 0%
QBR scheduled and held on time
Quarterly
Outcomes reviewed first
Quarterly
Open issues resolved or formally acknowledged
Quarterly
Max 3 actions agreed
Quarterly
Expansion opportunity assessed
Quarterly
Next QBR date set before closing
Quarterly
CHECKLIST PHASE 4 OF 4

Renew & Expand

SELECT PHASE
0 of 6 completed 0%
Renewal conversation opened 90 days before contract end
Annual
Documented outcomes assembled as renewal evidence
Annual
Renewal objections anticipated and addressed proactively
Annual
Expansion option presented alongside renewal
Annual
Referral request made at peak satisfaction moment
Annual
NRR (Net Revenue Retention) updated after renewal close
Annual
DISTRIBUTOR SALES CHECKLIST
CHECKLIST PHASE 1 OF 4

Prepare

SELECT PHASE
0 of 6 completed 0%
Sell-out targets agreed and signed
Monthly
Distributor profile current
Monthly
Distribution agreement in place
Monthly
Previous period actions reviewed
Monthly
Sell-out reporting format confirmed
Monthly
Review meeting date scheduled
Monthly
CHECKLIST PHASE 2 OF 4

Deliver Support

SELECT PHASE
0 of 6 completed 0%
Product training completed
Weekly
Sales tools delivered
Weekly
Co-marketing budget allocated and agreed
Weekly
New product introductions briefed
Weekly
Stock replenishment lead time confirmed
Weekly
Escalation contact confirmed
Weekly
CHECKLIST PHASE 3 OF 4

Monitor

SELECT PHASE
0 of 6 completed 0%
Sell-out report received by 5th of month
Weekly
Sell-out vs. target calculated per SKU category
Weekly
Stock-on-hand reviewed
Weekly
Distributors at <80% of target contacted within 5 business days
Weekly
Reorder pattern checked
Weekly
Market signals captured
Weekly
CHECKLIST PHASE 4 OF 4

Review & Act

SELECT PHASE
0 of 6 completed 0%
Previous action plan reviewed first
Monthly
Sell-out vs. target for the full quarter discussed
Monthly
Root cause confirmed for each gap >20%
Monthly
Max 3 actions agreed for next quarter
Monthly
Next quarter targets confirmed or revised
Monthly
Next review meeting date set before closing
Monthly
NEGOTIATION CHECKLIST
CHECKLIST PHASE 1 OF 5

Preparation

SELECT PHASE
0 of 7 completed 0%
Decision-maker confirmed
Today
Buyer's constraint identified
Today
Cost of inaction estimated
Today
Value case built
Today
Reference case prepared
Today
Walk-away position set
Today
Discount authority confirmed
Today
CHECKLIST PHASE 2 OF 5

Execution

SELECT PHASE
0 of 7 completed 0%
Opened with the problem, not the pitch
Today
Buyer constraint confirmed verbally
Today
Inaction cost made visible
Today
Objections surfaced and named
Today
Price defended as value — not discounted under pressure
Today
No unilateral concession made
Today
First step or close proposed
Today
CHECKLIST PHASE 3 OF 5

Red Flags

SELECT PHASE
0 of 5 completed 0%
"We'll think about it"
Always
"It's too expensive"
Always
Decision-maker not present
Always
Conversation is feature-vs-feature
Always
No urgency — no pain
Always
CHECKLIST PHASE 4 OF 5

Close & Follow-Up

SELECT PHASE
0 of 5 completed 0%
Next step confirmed verbally and in writing
Today
CRM updated
Today
Any approved deviations confirmed in writing
Today
Stall date set if no immediate close
Today
Result measured and documented after delivery
Today
CHECKLIST PHASE 5 OF 5

Growth Loop — Turn Every Deal into the Next

SELECT PHASE
0 of 6 completed 0%
Documented the buyer's result
Monthly
Client agreed to be a reference
Monthly
Next constraint identified
Monthly
Referral asked for
Monthly
Pattern identified
Monthly
Win/loss logged for monthly review
Monthly
PRICING CHECKLIST
CHECKLIST PHASE 1 OF 6

Pre-Quote: Customer & Segment

SELECT PHASE
0 of 6 completed 0%
Segment confirmed
Always
Volume potential assessed
Always
Decision maker identified
Always
Competitive situation known
Always
Timeline confirmed
Always
Budget signal obtained
Always
CHECKLIST PHASE 2 OF 6

Pre-Quote: Value Case

SELECT PHASE
0 of 6 completed 0%
Cost of problem quantified
Always
Cost of inaction documented
Always
Outcome measurable
Always
Value anchored before price
Always
Reference case ready
Always
Premium option prepared
Always
CHECKLIST PHASE 3 OF 6

Quoting: Price Structure

SELECT PHASE
0 of 6 completed 0%
Quote from approved price book
Always
Correct tier applied
Always
Promotional window checked
Always
Bundling opportunity evaluated
Always
Payment terms confirmed
Always
Quote valid period set
Always
CHECKLIST PHASE 4 OF 6

Negotiation: Price Objections

SELECT PHASE
0 of 6 completed 0%
Objection root cause identified
Always
"Compared to what?" asked
Always
Value re-anchored
Always
Trade considered before discount
Always
Discount conditional and time-limited
Always
Objection and response logged
Always
CHECKLIST PHASE 5 OF 6

Exception Approval

SELECT PHASE
0 of 6 completed 0%
Approval obtained before communicating discount
Always
Exception form completed
Always
Correct approver engaged
Always
"What do we get in return?" answered
Always
Approval documented in CRM or deal log
Always
Expiry of exception noted
Always
CHECKLIST PHASE 6 OF 6

Deal Close: Margin Tracking

SELECT PHASE
0 of 6 completed 0%
Final price logged in CRM
Always
Customer segment tagged
Always
Win / loss reason documented
Always
Finance notified of margin deviation
Always
Price conditions confirmed in contract
Always
Next review date set
Always
SALES PROCESS CHECKLIST
CHECKLIST PHASE 1 OF 4

Sales System Setup

SELECT PHASE
0 of 15 completed 0%
ICP & Target List
Ideal Customer Profile (ICP) defined and documented
Now
Target account list built (min 3× monthly quota)
Now
Decision-maker personas identified per segment
Now
Buying triggers mapped per target type
Now
Outreach channels defined per segment
Now
Sales Tools
CRM set up with correct pipeline stages
Now
Proposal template prepared and approved
Now
Pitch deck current and product-aligned
Now
Reference cases / case studies available
Now
Pricing sheet approved with discount limits
Now
Team Alignment
Revenue targets agreed and communicated
Now
Sales roles and territory split confirmed
Now
Handover process to operations documented
Now
Win/loss review process in place
Now
Pipeline review meeting scheduled weekly
Now
CHECKLIST PHASE 2 OF 4

Pipeline Building

Identify and qualify the right accounts

SELECT PHASE
0 of 12 completed 0%
Prospect
Account matches ICP criteria
Weekly
Company added to CRM with source
Weekly
Decision-maker identified by name/role
Weekly
Initial outreach sent (2+ channels)
Weekly
Follow-up task set with date
Weekly
No response after 3 touches → pause & re-assess
Weekly
Qualify
Budget confirmed or estimated
Weekly
Authority (decision-maker) confirmed
Weekly
Core need / pain point documented
Weekly
Buying timeline established
Weekly
Competitive alternatives identified
Weekly
Go/No-go decision recorded in CRM
Weekly
CHECKLIST PHASE 3 OF 4

Deal Progression

Move the deal from pitch to signed agreement

SELECT PHASE
0 of 18 completed 0%
Present
Pitch tailored to prospect's stated need
Weekly
Max 3 key benefits presented
Weekly
Relevant reference case included
Weekly
Objections heard and noted
Weekly
Next step agreed before meeting ends
Weekly
Meeting notes in CRM within 2 hours
Weekly
Propose
Proposal sent within 24 hrs of presentation
Weekly
Scope clearly defined — no ambiguity
Weekly
Price, timeline, and deliverables included
Weekly
Validity date stated on proposal
Weekly
Follow-up call booked at proposal send
Weekly
Proposal logged in CRM with date sent
Weekly
Negotiate
Walk-away terms confirmed internally first
Weekly
Objection type identified (price / scope / timing)
Weekly
Counter-offer includes a trade (not just a cut)
Weekly
All changes captured in writing
Weekly
Summary email sent after each negotiation round
Weekly
Revised proposal version saved in CRM
Weekly
CHECKLIST PHASE 4 OF 4

Close & Review

Confirm the win and keep the pipeline clean

SELECT PHASE
0 of 16 completed 0%
Close
Written confirmation received (signed / email)
Weekly
CRM updated to Closed Won / Lost
Weekly
Win/loss reason logged
Weekly
Operations briefed within 24 hours
Weekly
Invoice / contract initiated
Weekly
Next upsell / retention action planned
Weekly
Before the review
CRM updated by all reps before the meeting
Weekly
Stalled deals (>7 days no movement) flagged
Weekly
Last week's actions reviewed for completion
Weekly
Pipeline value and stage distribution checked
Weekly
Forecast for current week prepared
Weekly
During & after the review
Focus on stuck and closing deals first
Weekly
Next step confirmed per active deal
Weekly
Deals dead >30 days — disqualify or reassign
Weekly
Actions logged with owner and deadline
Weekly
Conversion rate by stage discussed (monthly)
Weekly
STAKEHOLDER COMMUNICATION CHECKLIST
CHECKLIST PHASE 1 OF 5

Preparation & Mobilisation (Day 1–5)

SELECT PHASE
0 of 6 completed 0%
Complete Stakeholder Register for all groups
Designate a single spokesperson for all external communications
Draft and approve the Opening Statement per audience
Set up the Communication Calendar (30/60/90-day)
Set up Communication Log (shared, real-time)
Brief all turnaround team members on communication rules
CHECKLIST PHASE 2 OF 5

Initial Stakeholder Outreach

SELECT PHASE
0 of 7 completed 0%
Board / Supervisory Board notified and briefed
Week 1
Key investors / shareholders notified and briefed
Week 1
Lenders / banks contacted with initial financial status
Week 1
Senior management team briefed
Week 1
All-employee communication issued
Week 1
Top 5 customers proactively contacted
Week 1
Critical suppliers contacted if supply continuity at risk
Week 1
CHECKLIST PHASE 3 OF 5

Ongoing Communication Cycle

SELECT PHASE
0 of 6 completed 0%
Weekly board / investor update issued on schedule
Recurring
Weekly lender update issued (crisis phase)
Recurring
Bi-weekly all-employee update issued
Recurring
All communications logged in Communication Log within 24 hours
Recurring
No external communication sent without Turnaround Lead approval
Recurring
Stakeholder concerns tracked and followed up within agreed timeframe
Recurring
CHECKLIST PHASE 4 OF 5

Crisis & Escalation Communication

SELECT PHASE
0 of 5 completed 0%
Material negative event reported to Turnaround Lead immediately
As needed
Holding statement drafted within 2 hours of event
As needed
Critical stakeholders notified within 4 hours of event
As needed
Crisis Communication Log entry created for every event
As needed
Post-event stakeholder update issued once situation is contained
As needed
CHECKLIST PHASE 5 OF 5

Turnaround Exit & Handover

SELECT PHASE
0 of 5 completed 0%
Turnaround Closure Report drafted and approved
Exit phase
Closure communication sent to all stakeholder groups
Exit phase
Communication Log archived in project folder
Exit phase
Ongoing governance communication owner confirmed
Exit phase
Communication SOP updated based on lessons learned
Exit phase
BUSINESS RECOVERY CHECKLIST
CHECKLIST PHASE 1 OF 5

Entry & Stabilization

SELECT PHASE
0 of 12 completed 0%
Cash & Financial
Exact cash balance confirmed across all bank accounts
Now
All committed outflows mapped for the next 14 days
Now
Discretionary spending freeze activated
Now
Net cash runway calculated in days
Now
Relationships
Main bank relationship manager contacted directly
Now
Top 3 creditors by exposure identified and contacted
Now
Top 3 customers (by revenue) assessed for flight risk
Now
People & Access
Management team briefed — role of Turnaround Manager explained
Now
Access to all financial systems and bank portals confirmed
Now
Key person risks identified — who must not leave in next 90 days
Now
Reporting
Day-1 Situation Report drafted and sent to Board / Owner
Now
Weekly reporting cadence established with Board
Now
CHECKLIST PHASE 2 OF 5

Diagnosis

SELECT PHASE
0 of 12 completed 0%
Financial Analysis
Last 12 months P&L reviewed line by line — trends identified
Today
Gross margin by product/service line calculated
Today
Fixed cost structure mapped and classified as Essential / Reducible / Eliminable
Today
Operations
End-to-end process flow mapped — constraint (bottleneck) identified
Today
Inventory or WIP levels assessed — cash tied up quantified
Today
Delivery performance to customers measured — on-time rate last 3 months
Today
Commercial
Top 20% of customers by margin identified and reviewed
Today
Sales pipeline reviewed — conversion rate and velocity measured
Today
Pricing compared to market — is price the reason customers leave or don't buy?
Today
People & Organisation
All department heads interviewed individually
Today
Decision-making bottlenecks identified — where do decisions slow down or stall?
Today
Diagnosis Report drafted — single root cause per domain confirmed
Today
CHECKLIST PHASE 3 OF 5

Recovery Plan

SELECT PHASE
0 of 10 completed 0%
Recovery Plan Readiness Checklist
Primary 90-day objective is specific, measurable, and agreed by Board
Week
Maximum 10 initiatives listed — each with a single named owner
Week
Each initiative has a completion date and a measurable outcome
Week
Hard decisions (closures, cuts, restructuring) are included — not deferred
Week
Legal counsel consulted on any headcount or contract changes
Week
Cash impact of each initiative modelled — runway extended by how much?
Week
Board has formally approved the plan — mandate documented
Week
Management team briefed on the plan — roles and responsibilities clear
Week
Weekly review cadence established — fixed time, fixed agenda, mandatory attendance
Week
Recovery Scorecard template created — 5 KPIs defined with targets
Week
CHECKLIST PHASE 4 OF 5

Execution (Weekly)

SELECT PHASE
0 of 14 completed 0%
Financial Position
Current cash balance confirmed and recorded
Weekly
Cash runway recalculated vs. last week — improving or deteriorating?
Weekly
Revenue for the week vs. target — variance explained
Weekly
Any payments missed or delayed by customers — follow-up assigned
Weekly
Plan Progress
Each initiative owner reports: done / not done / blocked
Weekly
Blockers identified from last week — resolved or escalated?
Weekly
Recovery Scorecard updated — Red / Amber / Green per KPI
Weekly
Any KPI Red for 2 consecutive weeks — escalation review triggered
Weekly
Commercial
Pipeline updated — new opportunities, stalled deals, lost deals this week
Weekly
Top 5 customers — any signals of dissatisfaction or risk of leaving?
Weekly
People & Operations
Any key person showing signs of disengagement or departure risk?
Weekly
Operational bottleneck status — improving, static, or worsening?
Weekly
Reporting
Weekly Board brief drafted — sent before end of day Monday
Weekly
Next week's commitments recorded — each owner has confirmed their deliverable
Weekly
CHECKLIST PHASE 5 OF 5

Close & Handover

SELECT PHASE
0 of 12 completed 0%
Results Confirmed
Primary 90-day objective: achieved or formally assessed
Week
Cash position stable — runway above 60 days minimum
Week
Monthly operating cash flow: positive or clearly trending positive
Week
Systems Installed
Early-warning indicators installed — 5 KPIs with thresholds and owners
Week
Monthly Management Review cadence in calendar — first three sessions scheduled
Week
Recovery Scorecard handed over to permanent owner
Week
Knowledge Transfer
Recovery Summary document written — root cause, actions, outcomes
Week
Next constraint named and briefed to CEO/MD
Week
All ongoing supplier/creditor agreements documented and transferred
Week
Formal Close
Board close-out presentation delivered — results vs. targets
Week
90-day check-in scheduled with CEO/MD post-handover
Week
Engagement invoice and final deliverables confirmed
Week
CASH CRISIS CHECKLIST
CHECKLIST PHASE 1 OF 4

First 24 Hours

Crisis declaration to initial stabilization. Speed matters. Do these in order.

SELECT PHASE
0 of 12 completed 0%
Command & Control
Appoint or confirm Turnaround Manager
Now
Freeze all non-essential outgoing payments
Now
Restrict bank payment authority to 2-person sign-off
Now
Notify Board / shareholders of crisis status
Today
Cash Visibility
Pull exact balances from all bank accounts
Now
List all receivables confirmed due within 14 days
Today
List all payments due within 14 days
Today
Produce Day-1 Cash Position Report
Today
Legal & Regulatory
Consult legal counsel on obligations and exposure
Today
Confirm all statutory payments are on schedule
Today
Check for any cross-default clauses in loan agreements
Today
Secure key contracts and documentation
Today
CHECKLIST PHASE 2 OF 4

Week 1

Stabilize, negotiate, and build the 30-day plan.

SELECT PHASE
0 of 10 completed 0%
Creditor & Bank Negotiations
Segment all creditors into Tier 1 / 2 / 3
Day 2
Contact lead bank — proactive briefing
Day 2
Contact all Tier 2 creditors — propose payment plan
Explore emergency credit options
Day 3–7
Create and maintain Creditor Register
Ongoing
Cash Generation Actions
Call all debtors over 30 days outstanding
Day 2
Stop supply to customers with 45+ day overdue accounts
Day 2
Identify assets available for rapid liquidation
Issue formal demand letters for 60+ day outstanding invoices
Request advance payments from key customers
Day 3–7
CHECKLIST PHASE 3 OF 4

Month 1

Structural fixes that prevent recurrence.

SELECT PHASE
0 of 7 completed 0%
Structural Stabilization
Complete cost structure review — eliminate non-essential spend
Week 2
Build 13-week rolling cash flow forecast
Week 2
Root cause analysis — what caused the cash crisis?
Implement new payment authorization controls
Week 2
Renegotiate payment terms with key suppliers
Tighten customer payment terms — move to 14-day standard
Week 3
Produce 30-day stabilization report for Board
CHECKLIST PHASE 4 OF 4

Ongoing Controls

Keep these running even after the crisis is resolved. Prevention beats recovery.

SELECT PHASE
0 of 6 completed 0%
Permanent Cash Hygiene Controls
Weekly cash flow review with management team
Weekly
AR ageing review — chase all 30+ day overdue invoices
Weekly
Monthly P&L and cash flow reconciliation
Monthly
Minimum cash buffer maintained at all times
Always
Quarterly review of credit facilities and covenant compliance
Quarterly
Annual stress test — what if revenue drops 30% for 3 months?
Annual
TURNAROUND DECISION CHECKLIST
CHECKLIST PHASE 1 OF 4

Diagnose

Collect data and map the symptoms

SELECT PHASE
0 of 14 completed 0%
Data Collection
P&L statements — last 12 months (month-by-month)
Today
Balance sheet — most recent + 12 months prior
Today
Cash flow statement — actual + 13-week forward forecast
Today
Customer revenue breakdown — top 10 customers by revenue
Today
Product/service margin breakdown by line
Today
Org chart with headcount, tenure, and cost per function
Today
Debt schedule — outstanding loans, covenants, maturity dates
Today
Any existing reports, audits, or turnaround attempts in the last 3 years
Today
Symptom Mapping
All visible problems documented as symptom statements (not solutions)
Today
Each symptom validated as fact (not assumption)
Today
Cause-effect chain built for each major symptom
Today
Root cause candidates identified and ranked by business impact
Today
Core constraint identified and typed (policy / resource / market)
Today
Core constraint agreed and signed off by CEO / decision-maker
Today
CHECKLIST PHASE 2 OF 4

Design

Resolve conflicts and define the future state

SELECT PHASE
0 of 16 completed 0%
Conflict Resolution
Core conflict stated — two legitimate needs in direct opposition
Week
Hidden assumption surfaced and named explicitly
Week
Assumption challenged — conditions under which it does not hold identified
Week
Injection defined — specific change that breaks the conflict without sacrificing either side
Week
Injection validated — no new negative side effects introduced
Week
Constraint Exploitation
Current constraint utilization measured (% on productive output)
Week
Waste removed from the constraint (rework, waiting, non-throughput work)
Week
All non-constraint processes subordinated to feed the constraint
Week
Capacity recovered from exploitation documented in writing (€ or hours)
Week
Investment request justified only if exploitation is provably insufficient
Week
Future State
Future state described in writing — specific, 12–18 month horizon
Week
Minimum 3 quantifiable KPIs defined as success criteria
Week
All prerequisites to the future state listed
Week
Each prerequisite assigned a named owner and deadline
Week
Resource and budget requirement confirmed by CEO / CFO
Week
Future state presented to and accepted by key stakeholders
Week
CHECKLIST PHASE 3 OF 4

Plan & Communicate

Structure the transition and align stakeholders

SELECT PHASE
0 of 11 completed 0%
Transition Planning
Transition plan built — actions, owners, deadlines, dependencies
Week
Weekly and monthly review rhythm scheduled for full plan duration
Week
Abort criteria defined in writing
Week
First 30-day sprint plan agreed and distributed to owners
Week
Budget tracking mechanism in place (planned vs. actual, weekly)
Week
Risk register created — top 5 risks with mitigations assigned
Week
Stakeholder Communication
Communication plan written — audience, message, timing, medium
Week
All internal audiences briefed before external communication is released
Week
First visible action confirmed within 48 hours of announcement
Week
Key customer communication handled by CEO personally (where applicable)
Week
Lender / creditor communication plan agreed (if applicable)
Week
CHECKLIST PHASE 4 OF 4

Execute & Close

Launch, monitor and close the engagement

SELECT PHASE
0 of 16 completed 0%
Monitoring & Control
KPI dashboard active — actual vs. target updated weekly
Weekly
Cash position reported weekly in writing to CEO and board
Weekly
Escalation triggers monitored — any trigger activates immediate escalation
Weekly
Constraint loop re-applied after primary constraint is resolved
Weekly
Engagement learning log maintained — what worked, what failed, and why
Weekly
Start of Engagement
Turnaround mandate confirmed in writing (scope, authority, duration)
Now
Data access granted — financial systems, operational data, staff interviews
Now
Confidentiality and conflict of interest confirmed
Now
Legal counsel engaged if insolvency risk is present
Now
Engagement fee structure and payment terms confirmed in writing
Now
Exit conditions defined — when does the engagement end and how?
Now
Engagement Close-Out
All KPI targets assessed — which were met, which were not
Week
Transition plan handed over to internal owner
Week
Final engagement report delivered to CEO and board
Week
Learning log finalized and archived
Week
Follow-up check scheduled — 90 days post-engagement
Week
FIRST 100 DAYS CHECKLIST
CHECKLIST PHASE 1 OF 5

Day 1 — Immediate Orientation

SELECT PHASE
0 of 9 completed 0%
Cash & Obligations
Get exact bank balance today
Now
List payments due in 14 days
Now
Identify overdue suppliers
Now
People
Meet leadership team — listen only
Now
Find out who knows what is really happening
Now
Operations
Identify what generates revenue today
Now
What would stop if the phones went dark?
Now
Legal / Risk
Check for pending legal actions
Now
Confirm no imminent regulatory deadline
Now
CHECKLIST PHASE 2 OF 5

Week 1 — Rapid Assessment

SELECT PHASE
0 of 10 completed 0%
Diagnosis
List all visible problems — no filtering
Today
Map cause-effect between problems
Today
Identify the core constraint (one)
Today
Revenue
Identify top 10 customers by revenue
Today
Check customer satisfaction status
Today
Review pipeline — what can close in 30 days?
Today
Costs
Map fixed vs. variable cost structure
Today
Identify 3 largest non-essential costs
Today
People
Talk to floor-level staff — no agenda
Today
Assess who is essential, who is disengaged
Today
CHECKLIST PHASE 3 OF 5

Day 30 — Stabilisation Review

SELECT PHASE
0 of 9 completed 0%
Plan vs. Reality
Review actions from Day 1 plan
Monthly
What was completed, what drifted?
Monthly
Update cash forecast — recalculate runway
Monthly
Focus
Confirm team still aligned on core problem
Monthly
Stop any initiative not connected to the constraint
Monthly
SOPs
Daily standup running consistently?
Monthly
Cash review SOP followed daily?
Monthly
Stakeholders
Key stakeholders updated with facts
Monthly
No promises made that cannot be kept
Monthly
CHECKLIST PHASE 4 OF 5

Day 60 — Progress Checkpoint

SELECT PHASE
0 of 9 completed 0%
Constraint Progress
Is the core constraint improving?
Monthly
Is throughput (revenue) increasing?
Monthly
What evidence proves direction is right?
Monthly
Metrics
3 KPIs defined and measured weekly
Monthly
Performance visible to the whole team
Monthly
Structure
Decision authority matrix published
Monthly
Weekly review meeting running with agenda
Monthly
People
Critical people retained and engaged
Monthly
Non-essential roles resolved (restructured or re-focused)
Monthly
CHECKLIST PHASE 5 OF 5

Day 100 — Completion & Reset

SELECT PHASE
0 of 11 completed 0%
Results
Core constraint reduced or removed
Quarterly
Cash position stable or improving
Quarterly
Revenue trend positive
Quarterly
Systems
SOPs documented and followed
Quarterly
Weekly performance rhythm embedded
Quarterly
12-month operating model built
Quarterly
Next Cycle
New constraint identified
Quarterly
Next 100-day focus defined
Quarterly
Lessons documented — the logic, not just the actions
Quarterly
Stakeholders
Credibility rebuilt through results
Quarterly
Forward plan communicated
Quarterly
RESTRUCTURING CHECKLIST
CHECKLIST PHASE 1 OF 4

Days 1–30

Are we going to survive next month? Stop the bleeding before restructuring anything.

SELECT PHASE
0 of 23 completed 0%
Cash & Liquidity
13-week cash flow model built and live
Now
All bank accounts consolidated in one daily view
Now
Non-essential spend frozen — purchasing authority centralized
Now
Accounts receivable aged list reviewed — recovery actions started
Now
Payment terms renegotiated with top 5 suppliers
Now
Cash runway calculated — weeks of operational coverage confirmed
Now
Creditor & Stakeholder Control
All creditors contacted proactively — before any default
Now
Bank relationships: current status confirmed, relationship manager informed
Now
Covenant breaches identified — waivers requested where needed
Now
Key investors/board aligned on the situation — no surprises
Now
Standstill agreements in place where full payment is not possible
Now
Legal counsel engaged — insolvency risk assessed
Now
Leadership & Decision Authority
One person unambiguously in charge of the turnaround
Now
Decision authority matrix drafted and published
Now
Daily standup established — 15 minutes, mandatory
Now
All major decisions documented — who decided, when, why
Now
Internal communication plan active — no rumour vacuum
Now
Information Baseline
Real P&L available — by product line and by client
Now
Gross margin per product/client calculated from actual data
Now
Full cost base mapped — fixed vs. variable identified
Now
Headcount and total employment cost confirmed per department
Now
Order book and pipeline reviewed — real revenue forecast built
Now
Management reports replaced with raw operational data
Now
CHECKLIST PHASE 2 OF 4

Days 30–90

Where does value get created — and where does it get destroyed?

SELECT PHASE
0 of 20 completed 0%
Constraint & Bottleneck
The primary constraint is named and agreed by leadership
Week
Constraint fully exploited — maximum output extracted from current capacity
Week
All non-constraint resources subordinated to protecting the constraint
Week
Investment in elevating the constraint justified and approved
Week
Next constraint anticipated — roadmap prepared for when current one breaks
Week
Portfolio Rationalization
Every product line classified: Keep / Fix / Exit
Week
Exit plan executed for loss-making lines — clients informed, transition managed
Week
Resources reallocated from exited lines to profitable ones
Week
Client concentration risk identified — dependency on top 3 clients quantified
Week
Non-core assets identified — sale or lease-back options evaluated
Week
Cost Structure
Cost reductions target costs that do not touch throughput
Week
Fixed cost base renegotiated — leases, service agreements, subscriptions
Week
Headcount decisions made — performers retained, underperformers addressed
Week
Savings tracked weekly against plan — actual cost reduction measured
Week
Impact of cost cuts on throughput assessed before every decision
Week
Supply Chain Stabilization
Critical suppliers identified — supply continuity secured for profitable lines
Week
Overdue supplier payments addressed — payment plans confirmed in writing
Week
Inventory reviewed — slow-moving or loss-making stock liquidated
Week
Single-source supplier risks mapped — alternatives identified where critical
Week
Payment terms extended with key suppliers — documented agreements
Week
CHECKLIST PHASE 3 OF 4

Months 3–6

Is the organization built to deliver results — or to maintain itself?

SELECT PHASE
0 of 18 completed 0%
Organization Design
New structure designed around strategy — not around existing people
Monthly
Management layers reduced — each layer owns decisions, not approvals
Monthly
Role clarity: every person knows what they own and what they decide
Monthly
People assessed against new roles — fit decisions made and communicated
Monthly
KPIs aligned with new structure — measuring output, not activity
Monthly
Financial Restructuring
Debt restructuring plan agreed with all major creditors
Monthly
Working capital management system operational — not just monitored
Monthly
New budget built around throughput — not last year's spend
Monthly
Refinancing completed or in formal negotiation
Monthly
Monthly financial reporting rhythm established — real numbers, on time
Monthly
People & Culture
Behaviours that caused the crisis identified and addressed directly
Monthly
High performers identified and retained — they know who they are
Monthly
Honest performance conversations held — no politics, no delay
Monthly
Team informed of restructuring progress — regularly, honestly
Monthly
Governance
Decision rights formally defined — every level knows its authority
Monthly
Board or investor aligned on recovery plan — milestones agreed
Monthly
Recovery KPIs reflect cash, throughput, and constraint progress
Monthly
Monthly plan validity review — is the strategy still correct?
Monthly
CHECKLIST PHASE 4 OF 4

Months 6–18

Why will this company grow — and who will care?

SELECT PHASE
0 of 9 completed 0%
Market Position
Specific target customer defined — not a market, a profile
Quarterly
Value proposition tested with real customers — not assumed
Quarterly
Competitive differentiation articulated — factual, not aspirational
Quarterly
Market size validated — is it large enough to sustain the business?
Quarterly
Revenue & Growth Engine
Pricing reviewed — reflects value delivered, not cost plus legacy
Quarterly
Recurring revenue model identified and being built
Quarterly
Sales pipeline visible, measured, and realistic
Quarterly
New client acquisition process repeatable — not dependent on one person
Quarterly
Dependency on top 1–2 clients actively reduced
Quarterly
error: Content is protected !!