the Basics explained

Capacity

Capacity explained

Find the bottleneck

How to find the bottleneck Map every step in the process and measure its throughput — units per hour, cases per day, whatever the output is. Then compare. One step will show a number significantly lower than the rest. That's your bottleneck. Three signals confirm it: Work piles up before that step (backlog, waiting, queue). The steps after it are underutilized. And the total output of the system matches the capacity of that one step — not the average, not the sum. The mistake most managers make is measuring average performance or total capacity. Neither tells you what the system actually delivers. Only the weakest link does. Once you find it, fix only that. Improving anything else first is wasted investment — you get more speed into the same wall.

How it works

Choose Free, Member, or Premium.

Register in under two minutes.

Log in and get the full library — SOPs, checklists, audits, action plans, and templates, organised by topic.

Run the checklist. Score the audit. Execute the action plan. Every tool ends in something you do.

No onboarding calls, no waiting.
Subscribe today → use it today.
Pricing

Simple, transparent plans

Free

€0

  • 10 articles/guides
  • 5 sample videos
  • 3 checklists (read-only)
  • demo tools preview.
Member

€ 25/month

All 6 modules full access
  • All 6 modules, full access
  • 100+ SOPs, checklists, audits
  • All action plans + templates
  • Excel downloads, Academy videos
  • AI Coach prompts
Premium

€ 150/month

  • Everything in Member
  • + monthly Q&A
  • + document review
  • + AI on your own business data
  • + turnaround coaching
  • + priority support.

  ©

+31237502708

© 2026 CTA-group. All rights reserved.

Quality check in Monza

It was a Tuesday in November, somewhere in an industrial zone north of Milan. I had been invited by a family business that manufactured metal components — good clients, third generation, proud of their machines. The factory manager's name was Marco. He wanted to show me everything. First the intake, then the production line, then packing, then dispatch. He walked fast, with the kind of pride you see in people who built something themselves.

At each station he named the capacity. Eighty units a day at intake. Sixty-five at processing. Ninety at packing. Seventy at dispatch.
He said it in the tone of someone presenting good numbers. I asked him what the quality check could handle.
A short silence.
"Thirty," he said.
"And how many do you ship per day?"
"Thirty."
I said nothing.
He looked at the floor.

We walked back to his office. On his desk was a proposal from a supplier — new packing machines, plus forty percent capacity, ninety thousand euros. He had already requested a quote.

"Marco," I said, "if you buy those machines, how many units will you ship per day?"
He thought for a moment. "Thirty," he said quietly.
That was the moment he saw it. Not as an accusation — just as a fact.
A chain delivers what its weakest link allows. Everything before and after can run as fast as it likes: the quality check decided what came out at the end. The new packing machines would simply wait faster.

We spent that afternoon on the quality check alone. Not the whole factory — just that one step.
Two additional inspectors, a different table layout, a simpler checklist.
Four weeks later: fifty-two units a day. The rest of the line had been capable of that for years.

He didn't buy the machines.

What I learned that day: it's not about the average -> it's not about the sum. It's about the one place where everything piles up, waits, and stalls.
That place determines what the system delivers — not what it could theoretically produce if everything were ideal.

Improve the wrong step, and you work harder for the same result. Improve the bottleneck, and the whole chain moves with it.

Find it first. Then fix it.

error: Content is protected !!